News
- Details
- Written by: Maintenance Guy
- Category: News
- Hits: 855
This is a very different version of the guidelines than the previous one. Gone are the old flowchart/decision tree logic diagrams and in come simplified if/then/goto/return directions that many of us may be familiar with from the BASIC programming of yesteryear or from completing the recent online census. In this case that may be for the best, as simplicity and clarity are surely what are required right now. It's particularly important when you consider the potential damage the whole EMF compliance issue may have on inducting new amateurs into the hobby. It really shouldn't be very difficult at all for new licensees to demonstrate compliance.
I was very happy to locate this nugget in the 'Other Questions' section at the end of the document too. It's something that I was hoping for. A common sense acknowledgement that you can 'assess for the worst case' and that would automatically cover any subsequent minor changes you make to your station setup which are only likely produce lower levels of exposure.
"You will only need to reassess compliance if you make changes to your equipment which is likely to increase the EMF exposure levels in any area where a member of the general public is or can be expected to be present. This could happen if, for example, you change or adjust the antenna or make other permanent technical changes to the equipment."
I think it indicates a reasonable approach to producing your compliance documentation, but it doesn't excuse you from doing the initial hard yards. You'll still have to have an assessment for each band/antenna/mode combination you operate on at a minimum. Note also the use of the word 'permanent'. The 'Pre-Assessed Configuration' concept otherwise referred to as the 'Compliant by design' approach is also a useful quick-fix, but come on... it's taken the RSGB months and months to come up with the documentation for a half wave dipole for goodness sake. What is any of that going to do to encourage experimenting with antennas?
One final highlight I discovered is that I have now correctly re-classified my good lady wife as a 'Worker' and so no longer have to worry about irradiating her. It was easier than asking her to sit the Foundation exam.
Here is a copy of the guidelines in full:
and here is a link to the RSGB website page which looks like it's being kept up to date with all the other various links to helpful resources:
Berni M0XYF
- Details
- Written by: Maintenance Guy
- Category: News
- Hits: 1226
You have a two-day window (today and tomorrow) to try and receive Slow-Scan TV pictures transmitted from the International Space Station using the callsign RS0ISS. The frequency used will be 145.800MHz FM, and will probably employ SSTV PD120 format. The radio used will be a Kenwood TM-D710.
The transmissions will be made as part of the Moscow Aviation Institute's SSTV experiments (MAI-75), and are specifically intended to be made during orbits over Moscow, but many other amateurs underneath the track of these passes will have the opportunity to capture the images too, including those in Europe, Asia, South America and Oceania.
Transmission times are slated for:
Wednesday 9th June between 09:35 and 13:50
Thursday 10th June between 08:55 an 15:50
All times are UTC and are subject to change.
Predicted overflight times for the International Space Station can be viewed on the AMSAT website:
Update
Additional transmission dates have now been announced:
Transmissions will start at around 0940 UTC on the 21st of June and images will be transmitted continuously until approximately 1830 UTC on the 26th of June.
- Details
- Written by: Maintenance Guy
- Category: News
- Hits: 1077
Our very own Rob M0KPD/M (don't forget the /M) is now bigger in America than Harry and Meghan.
Get to have a proper nosey around his Ford Transit and see just where that big fat signal comes from.
Here he is chatting to Tim K3LR about van-based radio that Ford never envisioned.
- Details
- Written by: Maintenance Guy
- Category: News
- Hits: 1356
The changes to our licences (now finalised by Ofcom) will be implemented pretty much as proposed in the consultation draft, albeit with some consideration having been given to feedback from various parties including UK amateurs and the RSGB.
These conditions will impact all UK radio amateurs, although having said that, maybe not some QRP operators.
Speaking to some of the other club members, it's clear that if you radiate a signal that falls into the qualifying criteria for having to assess your station for EMF compliance, then that's what you should do - and in that case you should fully document that process. I've re-written this part of my article, because it was factually incorrect, and was itself misleading. The point I wanted to make was that the flowchart below (click to enlarge) clearly states that if you stay under the specified power output (10W EIRP, 6.1W ERP), then NO ACTION is required. This chart is a generic one however, and not specifically aimed at amateur radio licensees. The one that was previously issued by Ofcom (and posted here) from their amateur-specific guidelines document is very different. This has currently been withdrawn from their website, pending a re-write and will be re-issued again by June 8th. We'll have to wait to see exactly what the new version says, but the old one stated that if your usage fell below the 10W EIRP / 6.1W ERP limit, then you SHOULD DOCUMENT that fact and the reasons that you don't have to complete an EMF assessment. We shall see what transpires.
The 'no action' outcome does seem to be more reasonable than saddling low-power users (particularly many Foundation level licence holders) with the responsibility of additional EMF record-keeping. It's still not completely clear in my mind though. It seems at first glance that Ofcom have over-simplified the flowchart below to the point of ambiguity.
It's also true that Foundation licence holders can quite legitimately take their allotted 10W output power, top it up to compensate for feedline losses and insert it into the feedpoint of a high-gain Yagi, or even a modest colinear, and be very much in a position of needing to assess their station for EMF compliance (see bottom illustration) so beware of falling into that trap.
What has become a lot clearer - and this may not be any great consolation to UK amateurs - is that we have been given a little longer to either get our compliance documentation in order, modify our antennas, or give up the hobby. Let's hope that there are only a small minority of us in that latter category. In reality though, with many folks having to cram compromised antennas into postage-stamp-sized back gardens, we may be left with such crippled capabilities combined with the frustratingly high levels of noise pollution from VDSL broadband and cheap imported power supplies etc. that it may not be worth carrying on for some of us.
Perhaps if Ofcom were to go after the big noise polluters out there, then we wouldn't need to run any more than 10W to speak to each other, although that would be a very sad state of affairs.
None of that is going to impact the timeline for compliance though, and here it is:
a) Until 18 November 2021 for any equipment which operates on frequencies at or above 110 MHz.
b) Until 18 May 2022 for any equipment which operates on frequencies above 10 MHz but below 110 MHz.
c) Until 18 November 2022 for any equipment which operates on frequencies at or below 10 MHz.
To view and download the new terms, conditions and limitations you can follow the link below:
Amateur Radio Licence Terms, Conditions and Limitations
Above: Yagi, sure - but I was surprised that even a standard colinear can tip you over into a compliance situation using 10W.
I'm sure there will be lots more to play out in the EMF shake-up.
Berni M0XYF

"You will only need to reassess compliance if you make changes to your equipment which is likely to increase the EMF exposure levels in any area where a member of the general public is or can be expected to be present. This could happen if, for example, you change or adjust the antenna or make other permanent technical changes to the equipment."





